Hi all, (By popular request in ASCII). Here is the list of to-do-items that are still open in the RIS move. All items that were completed (=80 to 90% of the work) are not on the list. Henk - - - - Integration with OPS (98% done) - Software Sync for RRC01-13 Few hours Bruce Procedures - Maintain operations draft Sep-Dec'04 Arife (background task) Routing Training - Stalled, looking for trainer. Ongoing work - MyASN handover 28/7 Matthew/Arife/Alexis/SED - MyASN documentation Now-R49 Matthew - RRC installation UAE ?? Matthew, Henk Integration with SED - Move III pages out of NP area 1 day Arife/James/Katie/Engin - Review docs on iii 1 week Arife/James/Katie/Engin Software move - Document existing software 4 weeks (50% done) Arife, James - Review documentation 2 weeks Engin, Katie - Prtraceroute with RISwhois 11/2004, 1 wk Katie - Maintain documents All Research Issues - Analysis of Beacon Data Fall'2004 Arife, Henk - BGP Stability Index Fall'2004 James - Website restructuring Summer Matthew, Henk ------------------------------------------------------------------------------ Henk Uijterwaal Email: henk.uijterwaal(at)ripe.net RIPE Network Coordination Centre http://www.amsterdamned.org/~henk P.O.Box 10096 Singel 258 Phone: +31.20.5354414 1001 EB Amsterdam 1016 AB Amsterdam Fax: +31.20.5354445 The Netherlands The Netherlands Mobile: +31.6.55861746 ------------------------------------------------------------------------------ Process and Procedure are the last hiding place of people without the wit and wisdom to do their job properly. (David Brent).
participants (1)
-
Henk Uijterwaal (RIPE NCC)