20 Jun
2013
20 Jun
'13
1:26 p.m.
On Thu, Jun 20, 2013 at 09:49:43AM +0200, andrea wrote:
At RIPE 66, the RIPE NCC suggested the following potential solutions:
A. Allow LIRs to change the status of their PI assignments to PA allocations (if equal or larger than the minimum allocation size)
Support, without the size limitation. rgds, Sascha Luck